Sunday, February 20, 2011

Each Our Own Way


Saturday, Bob worked on the outside portion of the air conditioning / heating unit...still. Drilling through 6" concrete walls takes so much time.

Brit ran the lift carefully around the chapel sanding the windows and touch up painting.

Monday we will start to marbleize the columns, I'm nervous at the beginning of any new project. I've only attempted marbleizing on a very small scale before (In a painting I did of a library). It may take a few attempts to get it right, but I'm game to try.

There are times I can't remember what I did. Oh yes, sealed the floor of the studio kitchen, (which has to be done twice). Then I spray painted half of the wrought iron across the catwalk. The wind blew, and I soon looked like black tar. Getting the paint off took more time than the actually painting.

No comments:

Post a Comment